• Price/Package: US $8.90 YOUR PRICES
  • Bronze Price:

    US $8.63

    3%off
  • Silver Price:

    US $8.37

    6%off
  • Gold Price:

    US $8.10

    9%off
  • Diamond Price:

    US $7.83

    12%off
  • Crown Price:

    US $7.57

    15%off
  • 8 Days
    Shipping Weight: 1,000(g)
  • Shipping Time:
  • Request More Product Information

    Request More Product Information

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-09-LF)

    *Category:

    Please select a category.

    Comments:

    Please input your request.

    I Want Smaller Lots

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-09-LF)

    Original Packing

    • QTY : Package
    • Package Size : g/package
    g

    Invalid Input

    I Want Mixed Products

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow, 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g(WOOD-Q003-23x8mm-09-LF)

    Comments: Please input your mixed request.

    • Item Code: Please input the item code.

      Comments: Please input your mixed request.

    + Add Mixed Products

  • Product Description

    Dyed Natural Long Oval Wood Beads, Oval/Oblong, Lead Free, Light Yellow

    Size: about 23mm long, 8~9mm wide, Hole: 2.5mm; about 2000pcs/1000g.

    Priced per 1,000 g


    Please Note: The color may be slightly different from the picture because of different display device.

  • Specification Size Info

    Size 23x8~9mm, Hole: 2.5mm, about 2000pcs/1000g
    Material Maple Wood
    Color Light Yellow
    Shape Oval
    Usage Beads
    Package Size 1,000 g per package
  • Customer Reviews

    Confirm

    Please Note

    OK

    Please Note

    OK

    Search by Image

    ·Search kbeads with an image instead of text. Try dragging an image here.

    • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
      2. The size of the image should be less than 5M!
      3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.
    • 1. The image must be in one of the following formats: .jpg, .png, .jpeg, .bmp, .gif, .webp, .tiff, .ppm
      2. The size of the image should be less than 5M!
      3. The image length and width must be greater than or equal 200 pixels and smaller than or equal to 1024pixes.

    Uploading File